Home >> News

13 Steps To The Car Repair Generator Belt

Mar. 04, 2019

What should I do with the vehicle maintenance Generator Belt? What should I do with the specific steps? Today CHEVROLET Parts Supplier to tell you the answer.

1. Drive the car to the two-post elevator station and raise the car.

2. Remove the engine bottom plate.

3. After the bottom plate is removed, the generator belt is seen, and the exposed generator belt is removed and removed.

4. Remove the crankshaft pulley and remove the crankshaft position sensor on the side of the crankshaft pulley.

5. Put the car down and remove the auxiliary tank. This makes it easy to remove the engine brackets and bolts on the sides of the belt.

6. Loosen the engine fixing bracket and the engine foot rubber to facilitate the removal of the bolts of the belt and the protective cover. Before releasing the engine mounting bracket, use a jack under the oil pan to prevent the engine from falling.

7. Disassemble the timing belt protection cover bolts, take off the protective cover, and see the timing belt with teeth.

8. There are 2 camshaft timing pulleys in the timing belt, 1 crankshaft timing belt shaft, 1 idler pulley and 1 timing belt tensioning pulley.

9. First remove the timing belt tensioner, and the belt will be taken down smoothly. Do not remove the idler pulley because the timing belt is replaced and the timing belt tensioner and timing belt idler 10 are replaced. The camshaft timing pulley and the crankshaft belt timing pulley are marked correctly.

11. Install a new timing belt, timing belt tensioner and idler.

12. Install the timing belt protection cover, install the engine fixed bracket and engine foot rubber, engine crank pulley and generator belt, bottom plate, etc.

13. Start the engine, check the engine running status, and finally complete the test run.

Generator belt for CHEVROLET N300 9051950

Shindary Automotive Parts Co., Ltd.

  • Add.: Rm.11-12, 4th Tower, Daya Jinkai Int'l Plaza, No.1230, Jinkai Ave., New North Zone, Chongqing, China.
  • Tel.: +86 23 6305 1623
  • Fax: +86 23 6320 5611
  • E-mail: overseas@shindary.com
  • Skype:
NEW ITEMS
New Product Alerts
+86 15823303378
+86 13969743028
CONTACT US
Top